Foundation Tube Systems

Tube shuttering accessories

Design:

Continuously height adjustable circular and square foundation tube shuttering

System descriptions:

Example: High-rise warehousing with over 500 cavities in the base plate.

The time needed to install gapping on site conventionally would be approximately 250 hours. Installing and aligning the MSL tubing is much quicker. Continuous adjustment over a range of approximately 80 mm or as specified.  

Benefits:

  • Considerably shorter assembly time through the use of MSL height adjustment
  • The time saved exceeds 80% over conventionally made gapping means on site
  • Height adjustment simultaneously serves as a means of countering buoyancy and lift in the cavity makers and tubing
  • Ease of use